发明名称 Verfahren zur Anbringung von Traegerlagen in Bauten und zur Verwendung bei diesem Verfahren vorgesehener Schlauch
摘要 1,267,048. Joining concrete slabs. INGENIORSFIRMAN NILCON A.B. 19 Sept., 1969 [30 Sept., 1968], No. 46252/69. Headings E1S and EIW. Precast reinforced concrete slabs 4 separated by sound absorbing material and resting on reinforced concrete coffer shaped beams 3 are joined in-situ by mortar 16 which fills the gap between adjacent slabs, mortar keying in longitudinal grooves in the slab edges and being prevented from flowing between the beams 3 or the slabs and beams by an inflated flexible longitudinal tube 14. The tube 14 may be deflated and removed from the join after hardening of the mortar. The joined slabs are levelled at the join by a filler 17 and are then covered with flooring material 18. The tubes uninflated are of flattened form and may have a longitudinal rib (19) Fig. 5 (not shown) to align the tube in the join and may have longitudinal reinforcing metal wires (21, 22). Protective plastic foil (10) Fig. 2 (not shown) covers the edges of the composite slab/ beam structure in transit. Hot air may be circulated in the gaps under the floor slabs.
申请公布号 DE1946026(A1) 申请公布日期 1970.04.09
申请号 DE19691946026 申请日期 1969.09.11
申请人 JONELL,PER OLOF;NILSSON,SVEN MELKER 发明人 OLOF JONELL,PER;MELKER NILSSON,SVEN
分类号 E04B1/62;E04B1/68;E04B5/08;E04F15/20 主分类号 E04B1/62
代理机构 代理人
主权项
地址