摘要 |
In a method for controlling a compression installation (1), the installation has at least two compressor units (i=1, , N) that can be separately turned on or off, a plurality of devices for modifying the output of the compressor units and a control device (10). Known methods and devices do not function optimally in terms of the power consumption of the entire compression installation. The power consumption (EG) for the operation of a plurality of compressor units (i=1, , N) of a compression installation (1) can be optimized by calculating a novel circuit configuration (Si, t) and automatically adjusting the novel circuit configuration (Si, t) by a control device (10). |