发明名称 SCHEDULING METHOD FOR IRON AND STEEL INDUSTRY
摘要 PURPOSE:To prepare a schedule capable of minimizing an amount of work inprocess goods between each process by comparing the processing amount of each process with the throughput of each process, and fulfilling the processing contract of each process when a comparison expression; processing amount <=throughput is satisfied for the schedule of the intermediate process decided based on a build-up calculation. CONSTITUTION:A required amount and schedule in the final process are applied (step 101), the build-up calculation of each date required amount of each process is executed based on them (step 102), the processing amount and schedule of each intermediate process are decided (step 103), and when the processing amount of each intermediate process is beyond the throughput (step 104), the schedule is made to satisfy the processing contract of each process (step 105).
申请公布号 JPH05282321(A) 申请公布日期 1993.10.29
申请号 JP19920103985 申请日期 1992.03.31
申请人 发明人
分类号 G05B19/418;B65G61/00;G06Q10/00;G06Q50/00 主分类号 G05B19/418
代理机构 代理人
主权项
地址