发明名称 A backtracking resources planning algorithm
摘要 <p>A method of scheduling a plurality of tasks includes the steps of establishing a node representative of each task, and indicative of resources required to perform that task. A hierarchy is established between the nodes to indicate an order in which tasks represented by the node are to be performed. The nodes whose hierarchy permits tasks represented by the node to be performed are selected to a next nodes list. A source is assigned to each of the selected nodes and is indicative of a priority to be accorded to respective ones of the selected nodes. The node with the highest priority is scheduled.</p>
申请公布号 AU2002336855(A1) 申请公布日期 2003.05.12
申请号 AU20020336855 申请日期 2002.10.31
申请人 THERMO CRS LTD. 发明人 MICHAEL PECK;BLAIR LEDUC;PAMELA ANN MARIE RENTON
分类号 G05B19/00;G05B19/4097;G06Q10/00;(IPC1-7):G06F9/50 主分类号 G05B19/00
代理机构 代理人
主权项
地址