摘要 |
The present invention relates to an embankment construction method for water preloading, using a steel system temporary wall. The embankment construction method for water preloading is to rapidly construct and demolish an embankment for stability the ground and storing water by preloading the water to correspond to a site condition and enable construction of the embankment with an excellent independence property and excellent site availability. According to the present invention, the embankment construction method for water preloading, using the steel system temporary wall includes: a first step of constructing a temporary wall in which the circumference unit is blocked from the outside, on the ground; a second step of forming a water loading unit capable of containing a fixed amount of the water by installing a cutoff mat inside the temporary wall constructed in the first step; a third step of preloading the water contained in the water loading unit on the ground by containing the water in the water loading unit constructed in the second step; and a fourth step of draining the water contained in the water loading unit after the preloading is completed in the third step. The first step is to install the temporary wall to stand by itself by being embedded in the ground by a embedded length of the lower part or by being anchored to the ground by a ground mounting unit of the lower part. |