摘要 |
<p><P>PROBLEM TO BE SOLVED: To perform active evaluation without exerting adverse effects on actual network operation. <P>SOLUTION: In a load testing system, a transmission device measures a bandwidth of user data transmitted from a user terminal in real time, calculates calculation bandwidth, by subtracting the bandwidth of the user data measured from an arbitrary evaluation bandwidth preset to evaluate the performance of a network, and transmits test data corresponding to the calculation bandwidth, together with the user data corresponding to the bandwidth of the user data used. A receiving device receives the user data and the test data concurrently transmitted with the user data, and evaluates the performance of the network, on the basis of the user data and test data received. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |