摘要 |
A method of installing a flexible line between an offshore platform and a subsea structure. The method comprising at least partially deploying the line in the water using an installation vessel located outside of an exclusion zone in the vicinity of the platform, including lowering a topside end of the line either to the seabed or to an intermediate location between the seabed and the platform. The method further comprises pulling the topside end to a position within the exclusion zone and winching the topside end up to the platform, and coupling the topside end to the platform. |