摘要 |
PURPOSE:To save a transit time of a transit passenger with securing convenience at floors except a transit floor. CONSTITUTION:Group management control devices 3a, 3b are connected with a communication part 31 and send respective current traffic current and control methods. Frequency and phase of respective elevator' s arrival to a transit floor is obtained by an arrival frequency measuring part 32 and number of transit passengers are measured by a transit passenger measuring part 34 and a main traffic current is determined by a transit traffic measuring part 36. Arrival order to the transit floor of the elevator of the respective bank is determined by an assigned control part, 37 and assigned control for transit. |