发明名称 GROUND FILLING CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To fill the large depth and a long section, with improved work efficiency and reduced drilled hole diameter, in a ground filling construction method of the ground having a risk of liquefaction, particularly, an existing structure lower part hard to fill the ground. SOLUTION: This ground filling construction method comprises an outer pipe 20 having an outer pipe delivery port 22, and an inner pipe 21 loosely inserted into the outer pipe 20, having a plurality of expansive-contractive inner pipe packers 27 at an interval so as to sandwich the outer pipe delivery port 22, also having a packer inner delivery port 29 and having an inner pipe delivery port 30 between the inner pipe packers 27 provided at an interval. An outer pipe inner space 32 is arranged in a drilled hole 23 drilled by a boring rod for incorporating a position information transmitter on the tip, and is formed between the plurality of inner pipe packers 27 by sending a filling liquid to an inner pipe flow passage 31. The filling liquid is delivered in the the outer pipe inner space 32 from the inner pipe delivery port 30, and is filled in the ground via the outer pipe delivery port 22. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006152594(A) 申请公布日期 2006.06.15
申请号 JP20040341933 申请日期 2004.11.26
申请人 KYOKADO ENG CO LTD;TAISEI CORP;KANPAI CO LTD;SANSHIN CORP 发明人 SHIMADA SHUNSUKE;SHIBA YUKIO;HIGAKI KANJI;KAWAI SHUNSUKE;KATSUTA TSUTOMU;SUZUKI TAKEHIKO;KOIZUMI RYONOSUKE;HAYASHI KEIJIRO
分类号 E02D3/12 主分类号 E02D3/12
代理机构 代理人
主权项
地址
您可能感兴趣的专利