摘要 PURPOSE:To shorten a working time, by a method wherein, after a scaffold additionally functioning as a jig for assembling reinforcements is installed and main reinforcement for the jig is arranged, distribution bars are suspended to assemble reinforcements, and thereafter the scaffold is removed. CONSTITUTION:After concrete 1 for consolidation of foundation is placed in an excavated hole, a scaffold 2 additionally functioning as a jig for assembling reinforcements is installed and the scaffold 2 is supported by a swing preventing support 3, a main reinforcement 4 is temporarily secured to the scaffold 2. The support 3 is temporarily removed, a hoop reinforcement is suspended with the aid of a distribution bar arranging device 5 to support it again by means of the support 3. The main reinforcement 4 is pulled up for rise to assemble reinforcements, and after the scaffold is removed, concrete 6 is poured.
申请公布号 JPH0458523(B2) 申请公布日期 1992.09.17
申请号 JP19850067611 申请日期 1985.03.30
申请人 SHIMIZU CONSTRUCTION CO LTD 发明人 KAWAI TATENORI
分类号 E02D5/34;E04G3/00;E04G21/12 主分类号 E02D5/34
代理机构 代理人
主权项
地址