发明名称 SYSTEM AND METHOD FOR REPLACEMENT OF TRACK BED BALLAST FOR RAILROAD
摘要 <p>A working train (51) of a one-line unit system includes hopper cars (53a to 53e) with new ballast (NB) loaded thereon and a ballast working car (52). The ballast working car (52) has out-conveyors (57a, 57b) for allowing already laid ballast (B) to be scraped up and the scraped-up ballast to be conveyed onto a rearmost hopper car (53e) and an unloading conveyor (58) configured to unload the new ballast (NB) into a dug-up site (21) where the ballast B has been scraped up. The hopper car (53a, ..., 53e) has a first belt conveyor (61) which conveys the ballast (B) onto a forwardmost hopper car (53a) and second and third belt conveyors (62, 63) which convey the new ballast (NB) onto the unloading conveyor (58). <IMAGE></p>
申请公布号 EP1369529(B1) 申请公布日期 2006.06.14
申请号 EP20010912272 申请日期 2001.03.12
申请人 MITSUBISHI HEAVY INDUSTRIES, LTD.;CENTRAL JAPAN RAILWAY COMPANY;NIPPON SHARYO LTD.;THE JAPAN MECHANISED WORKS AND MAINTENANCE OF WAY. CO. LTD.;MIZUTANI-GUMI CO. LTD 发明人 TANAKA, MASAYUKI;MIYAMOTO, TAKASHI;ABE, KINICHI;ODA, HIDEKATU;MIYAJI, HARUYOSHI;TAMAI, AKIRA;KATO, YOSHINORI;OJIMA, TOMOYUKI
分类号 E01B27/10 主分类号 E01B27/10
代理机构 代理人
主权项
地址