摘要 |
PROBLEM TO BE SOLVED: To provide a work management apparatus configured to manage works performed on each of work objects, a work management system, and a program.SOLUTION: A smart terminal 2 includes a work information acquisition section 211, a position information acquisition section 212, a work object information acquisition section 213, and an information management section 214. The work information acquisition section 211 acquires work information on the contents of a work performed on a work object by use of a tool 1, from the tool 1. The position information acquisition section 212 acquires position information on a work place, on the basis of positioning data of a GPS receiver 3. The work object information acquisition section 213 acquires work object information identifying a work object, on the basis of information obtained by reading a bar-code attached on a member of a work object, with a bar-cord reader 4. The information management section 214 causes a storage section 26 to store the work information, the position information, and the work object information, for each of the works, in association with each other.SELECTED DRAWING: Figure 1 |