摘要 |
<p>PROBLEM TO BE SOLVED: To develop a recycle system provided with a schedule modifying function which can surely execute a production schedule of recycled product even when the amount of recovered used products is changed contrary to the prediction at the recovery time. SOLUTION: In the reuse system of components which constitutes the recovered reused products (12), on the basis of information (15) from a means (16) to know an recovery information for reused products, a means (19) to know an information of whether the components of the reused products are reusable or not and a means (18) to know the number of reusable components, the production schedules (14, 20) are set for recycled products using the reusable products, components or raw materials.</p> |