发明名称 CONSTRUCTION METHOD FOR SIDEWALL PILOT TUNNEL TYPE TUNNEL AND ITS STRUCTURE
摘要 PROBLEM TO BE SOLVED: To provide a construction method for a sidewall pilot tunnel type tunnel and its structure for shortening a construction term and reducing cost of construction as much as possible. SOLUTION: This construction method comprises a sidewall pilot tunnel forming process for excavating and forming a pair of sidewall pilot tunnels 6, 6 at both of right and left side part positions in a main pit 4 by preceding the excavation of the tunnel main pit 4, a concrete sidewall forming process for forming concrete sidewalls 12 supporting a timbering 10 in the main pit 4 in the pair of pilot tunnels 6, 6 over the predetermined length by placing concrete successively, and a tunnel main pit forming process for forming the main pit 4 by installing the timbering 10 by stretching over upper faces of a pair of sidewalls 12, 12 while excavating between the pilot tunnels 6 and 6 after the sidewalls 12 are hardened. Ruler members 30 for prescribing top face part lines and inner face part lines of the sidewalls 12, 12 are arranged on wall surfaces of the pilot tunnels 6, 6 and concrete 40 is sprayed into a space prescribed by the ruler members 30 by a plurality of times in many layers to fill the space with the concrete and form the sidewalls 12 having the desired shape in the concrete sidewall forming process. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2008308835(A) 申请公布日期 2008.12.25
申请号 JP20070155616 申请日期 2007.06.12
申请人 OHBAYASHI CORP 发明人 MIYAGAWA SHUNSUKE
分类号 E21D11/10;E21D9/00;E21D13/02 主分类号 E21D11/10
代理机构 代理人
主权项
地址