A process to transport a blow out preventer (50) for a drilling rig (13) having a drawworks wherein the blow out preventer is transported between a storage area (upper 50) and a use position (lower 50) over a wellbore. The process includes the steps of connecting an upper connector end of an elongated running tool (60) to the drawworks of the drilling rig. The elongated running tool is moved in position parallel to the wellbore using the drawworks of the drilling rig. The running tool is lowered so that a stab connection is made between a lower connector end of the running tool and the blow out preventer. The blow out preventer is thereafter moved over and in alignment with the wellbore. |