发明名称 METHOD FOR FORMATION OF CUT CAVITY IN STRONG STRESSED ROCKS
摘要 Method for formation of cut cavity at penetration of horizontal mine working, for instance drill drift that is constructed on drill horizon in production block in which due to blasting charges of three-level cylindrical cut with delay, beginning from charges of cumulative effect of third level to compensation cavity formed in central part of the working, in zone of effect of three-dimensional heat field, with re-distribution of static stresses in direction of working penetration increase of depth and volume of coal cut working is achieved. The method makes it possible to increase effectiveness and shape of charge of explosive substance and to increase rate of working penetration.
申请公布号 UA88827(C2) 申请公布日期 2009.11.25
申请号 UA20080003853 申请日期 2008.03.27
申请人 M.POLIAKOV INSTITUTE OF GEO-TECHNICAL MECHANICS OF THE NAS OF UKRAINE 发明人 BULAT ANATOLII FEDOROVYCH;ISCHENKO KOSTIANTYN STEPANOVYCH;OSINNII VALENTYN YAKOVYCH
分类号 主分类号
代理机构 代理人
主权项
地址