摘要 |
<p>PROBLEM TO BE SOLVED: To make operation efficient and to save the labor by totally connecting a series of data processing stages from data input to the plan designing and construction of sewerage and management after construction. SOLUTION: This sewerage construction designing support system previously sets numerals handled in sewerage construction designing, calculation conditions, and plotting and tabulation conditions and when sewerage plan data representing a sewerage construction route in three dimensions are set according to actual state figure data and buried body position data, it is examined whether or not a set flow rate calculated under the numeral and calculation conditions is within a permissible range according to the set sewerage plan data; and a plan drawing and a plan calculation sheet are generated under the plotting and tabulation conditions according to the examined sewerage plan data. When the set flow rate is not within the permissible range, it is indicated that sewerage plan data should be set again. The plan drawing is readjusted to sewerage data which can be associated with a GIS system after the construction.</p> |