摘要 |
PROBLEM TO BE SOLVED: To provide a scheduled arrangement system for improving producing efficiency in each process by distributing a free time to each production process, and performing scheduling independently for each process at the time of making the production plan of an order receiving industry. SOLUTION: A free time 33 is calculated based on a startable date 23, a limit time 25, and an actual work required total time 31, and the free time 33 is distributed to each process. Then, the free movable range 41 in each process is calculated, and scheduling is operated in each process. The free time is redistributed to a prescribed process whose efficiency is required, and the free movable range 41 is calculated, and then the scheduling is decided. |