发明名称 Method and equipment for constructing underground tunnel along predetermined route involve bar placed in ground, along with excavating equipment is moved
摘要 <p>The method and equipment for constructing an underground tunnel along a predetermined route involve a bar placed in the ground, along which excavating equipment is moved. The bar and equipment are engaged by a drive unit supplying at least a part of the power to move the excavating equipment. At the same time as the excavating equipment the bar is displaced. Tunnel wall parts are moved along the bar by a wall drive device which engages both the bar and the tunnel wall parts. With the method, construction pits (30,32,34,36) are installed beneath ground level (38), and the bar (62,68,74) is fitted through the pits.</p>
申请公布号 NL1015942(C2) 申请公布日期 2002.11.26
申请号 NL20001015942 申请日期 2000.08.15
申请人 HEEREMA HOLDING CONSTRUCTION INC. 发明人 FRITS-JAN KOPPERT;CORNELIS VAN ZANDWIJK
分类号 E21B7/28;E21D9/00;E21D9/12;(IPC1-7):E21D9/10;E21D11/08 主分类号 E21B7/28
代理机构 代理人
主权项
地址