摘要 |
<P>PROBLEM TO BE SOLVED: To certainly install cap portions 21, 22 to connecting port 11, 23 while a covering plate 2 is blocked, in a fluid outlet protecting cap installed to a fluid outlet openably blocking an area where the pair of the fluid passage connecting ports 11, 12 are exposed by the covering plate 2, comprising the cap portions 21, 22 detachably and watertightly installed to the connecting ports 11, 12. <P>SOLUTION: A through hole 24 is formed at a position corresponding to the connecting ports 11, 12 on the covering plate 2 in a blocking state, and the cap portions 21, 22 are installed in the through hole 24 so as to forwardly and backwardly move in a both sides direction in regard to the covering plate 2. When pressed into the deepest position, the cap portions 21, 22 are completely installed to the connecting ports 21, 22. Unless pressed in the deepest position, parts continuing to base end portion sides of the cap portions 21, 22 are set to project out from the surface of the covering plate 2 by a specified height. <P>COPYRIGHT: (C)2003,JPO |