发明名称 METHOD OF CONSTRUCTING MANAGEMENT BULKHEAD
摘要 PROBLEM TO BE SOLVED: To prevent water from flowing in the inside and outside of a partition by improving a deposited layer under a caisson by impermeable treatment and also performing the impermeable treatment for the base of the caisson at a partition bulkhead in a waste reclaimed site. SOLUTION: When an ocean structure 10 is constructed by installing the caisson 11, an impermeable ground improvement part 4 is constructed by mixing a hardener with the deposited layer 3 on the upper side of a sea bottom ground 1, and an excavated groove part 5 is constructed on the portion of the deposited layer on which the caisson 11 is installed. After a foundation stone layer 6 is constructed, an asphalt mixture is placed, and the areas between the stones of the foundation stone layer are filled with a fluidized matter for hardening. A joint water-impermeable treatment part is also constructed between the caissons 11 to prevent water from flowing between the inside and the outside of the partition bulkhead without forming the gap between the lower part of the ocean structure and the caissons. COPYRIGHT: (C)2009,JPO&INPIT
申请公布号 JP2009085005(A) 申请公布日期 2009.04.23
申请号 JP20080300261 申请日期 2008.11.26
申请人 WORLD ENGINEERING KK;NIPPON ROAD CO LTD:THE;TAISEI ROTEC CORP;NIPPON KAIJO KOJI KK 发明人 WAGI TAKATSU;ORIGASA MASAMI;NONODA MITSURU;ITO TAKAHIKO;MATSUZAKI KATSUO;NAKANO HIROSHI
分类号 E02B3/12;B09B1/00;E02B3/16;E02D19/16;E02D23/00 主分类号 E02B3/12
代理机构 代理人
主权项
地址