PROBLEM TO BE SOLVED: To provide a method of developing reclaimed tideland, for developing tideland which is free from a risk of consolidation settlement, fit for an ecosystem of a reclaimed tideland scheduled zone, and dispenses with additional earthquake resisting work. SOLUTION: The method of developing the reclaimed tideland has a sand pile driving step in which a number of sand piles are driven into submarine ground in a reclaimed tideland scheduled area at a depth equal to or lower than a mean low tidal level, and a bulging area of a surface layer of the submarine ground, that occurs due to the driving, is used as the tideland. COPYRIGHT: (C)2007,JPO&INPIT
|