摘要 |
PROBLEM TO BE SOLVED: To provide a construction method which, when constructing a heat insulation foundation comprising: foundation concrete which has a base section and an erection section formed into a vertically erected batten plate and is placed on leveling concrete; and heat insulation forms which are respectively connected to both sides of the erection section of the foundation concrete, enables concrete for the base section and the erection section to be concurrently placed and thereby achieving work saving, shortening of a construction period and a reduction in a construction cost and significantly reduces a risk of water leak by avoiding formation of a placing joint between the base section and the erection section of the foundation concrete.SOLUTION: A support M which supports at least one of heat insulation forms K1 above leveling concrete S before foundation concrete C is placed, comprises: a support post T vertically erected from the leveling concrete S; a form holding body H where the heat insulation form may be placed thereon with a lower section of the heat insulation form connected thereto; and a height adjustment mechanism which enables the form holding body H to be connected to and supported by the support post T in a manner that makes a height of the support post T adjustable.SELECTED DRAWING: Figure 3 |