摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a production system which reduces a stock space for assembly components required on a sub-line side and prevents erroneous selection of assembly components during assembling work in a main line and flexibly and easily responds to a change in a production plan. <P>SOLUTION: A read means 3 which reads work information related to each work W from an information recording member 2 provided in association with the work is provided on the side of the main line 1, and information terminals 10 and 11 which receive the work information obtained from the information recording member 2 by the read means 3 are provided on the side of the sub-line 6, and the assembly components 4 produced in the sub-line 6 are transferred to a transport member 7 on the basis of the work information received by the information terminals 10 and 11. <P>COPYRIGHT: (C)2007,JPO&INPIT</p> |