摘要 |
PROBLEM TO BE SOLVED: To provide a construction method for a structure, which can shorten a construction period.SOLUTION: A construction method for a structure 10 includes: a precast foundation member installation step of installing a precast foundation member 20 on ground G; an upper structure construction step of constructing an upper structure 14 supported by the precast foundation member 20; and a foundation base part formation step of forming a foundation base part 40 by placing concrete on the periphery of the precast foundation member 20 in parallel with the upper structure construction step.SELECTED DRAWING: Figure 1 |