摘要 |
PROBLEM TO BE SOLVED: To provide an arrangement structure for a piping penetration part, which facilitates construction work for the piping penetration part in a building and which can keep the degree of freedom of construction and equipment planning of the building high, and the building.SOLUTION: In an arrangement structure for a piping penetration part in a building of reinforced concrete construction and the like, a plurality of wall areas 4 surrounded by a column 2 and a beam 3 exist, and the piping penetration parts 11-21 are provided in the wall areas 4. The piping penetration parts 11-21 are provided within wall units 6 of the same shape, which are formed by dividing the wall areas 4 in a vertical direction.SELECTED DRAWING: Figure 1 |