摘要 |
PROBLEM TO BE SOLVED: To calculate a time when a window of each group has been in an active state.SOLUTION: A calculation program stores operation information for a plurality of windows corresponding to an application or a file opened on a computer in a storage part (Fig. 6A to 6B), windows which have alternately become an active state or windows where data have been copied or moved from one to the other are grouped to a window group on the basis of the operation information stored in the storage part (Fig. 10A to 10C), and about the grouped window group, processing for calculating a time when the windows belonging to the window group have been in an active state (Fig. 23A) is executed on the basis of the operation information stored in the storage part.SELECTED DRAWING: Figure 10A |