摘要 |
A quick emergency processing method and system for a power failure accident of a transformer substation. The method comprises: acquiring an emergency accident compiling plan of a power distribution network line, wherein the emergency accident compiling plan comprises an isolation plan and a recovery plan; judging whether the emergency accident compiling plan meets a first preset condition or not; when the emergency accident compiling plan meets the first preset condition and the power distribution network line is in failure, executing the isolation plan, thus isolating a corresponding failure region; and after the failure region is isolated, executing the recovery plan, thus recovering the power supply of the failure region. The quick emergency processing system and method for a power failure accident of a transformer substation provided by the present invention not only shorten power failure time about the power failure accident of the transformer substation, but also reduce a workload for processing the power failure accident of the transformer substation. |
申请人 |
HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER COMPANY;STATE GRID CORPORATION OF CHINA (SGCC);STATE GRID ZHEJIANG ELECTRIC POWER COMPANY |
发明人 |
ZHENG, Weiyan;QUE, Bo;ZHONG, Hui;ZHU, Yiyong;CHEN, Lei;SU, Yifang;HUANG, Wuhao;LIU, Jiaqi;WANG, Kai;ZHAO, Zheng;YUAN, Zhe |