发明名称 BRIDGE FOOTING SYSTEM FOR ACCELERATED BRIDGE CONSTRUCTION AND CONSTRUCTION METHOD OF BRIDGE WITH THE SAME SYSTEM
摘要 A bridge foundation for accelerating bridge construction and construction method using the same are provided to pour concrete to a foundation structure in which first and second steel plates are combined to each other and a floor slab at the same time to reducer the time. A bridge foundation for accelerating bridge construction includes piles(10), and a foundation structure(30) connected with the pile. The foundation structure comprises a plurality of first steel plates and a plurality of second steel plates. The first and second steel plates are fit to each other through a plurality of slits.
申请公布号 KR100761741(B1) 申请公布日期 2007.09.28
申请号 KR20060062023 申请日期 2006.07.03
申请人 RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY;INTERCONSTEC CO., LTD.;DONGA S-TEC CO., LTD. 发明人 PARK, CHAN HEE
分类号 E02D27/12;E01D19/00;E02D27/08 主分类号 E02D27/12
代理机构 代理人
主权项
地址
您可能感兴趣的专利