摘要 |
PROBLEM TO BE SOLVED: To provide a method for building/repairing coke dry quenching facilities where the assembling/disassembling of a cooling tower can be performed in a short time, and further, influence on a coke oven operation is reduced, and the stop of the oven can be made the minimum. SOLUTION: Regarding the method for building/repairing coke dry quenching facilities, a cooling tower in coke dry quenching facilities constructed at the oven front in a coke oven is made into a plurality of blocks obtained by being cut at a plurality of places in a height direction, and they are produced in a factory, and, at the oven front in the coke oven, the respective blocks produced in the factory are successively taken in and heaped up or successively taken away and carried out, thus the assembling/disassembling of the cooling tower body are performed. COPYRIGHT: (C)2009,JPO&INPIT
|