摘要 |
<P>PROBLEM TO BE SOLVED: To provide a fitting structure of cradlings by which the fitting work can be performed swiftly without collation with an allocation surface, and lack of a cradling member, if any, can be discovered quickly to minimize the influence on the process. <P>SOLUTION: The fitting procedure of the cradlings at a construction site is as follows. (1) A predetermined starting point B and a fitting direction of the cradling members 6 are confirmed. (2) The cradling members 6 are arranged on a floor surface at the position far from the starting point B with labels 13 upward and according to the fitting direction of the cradling members 6. (3) The cradling members 6 are fitted in sequence from the depth according to arrangement information on each of the cradling members 6 described on the labels 13. <P>COPYRIGHT: (C)2009,JPO&INPIT |