摘要 |
A wavy retaining wall construction method using a tumbler tube is provided to prevent the leakage of water even if a LW method is omitted, to prevent the leakage of water in case of the movement or deformation of a wale or a strut, to have an economic effect by having a structural composite effect in one group of three piles. A wavy retaining wall construction method using a tumbler tube comprises the steps of forming a tumbler tube with a tumbler tube soldier pile(1) by inserting reinforcement cages to holes bored at fixed intervals and filling up with concrete, completing a deformed CIP pile(2) in the gnawed shape at one side by a CIP pile having holes bored adjacently by facing with the distorted surface of the tumbler tube soldier pile and boring holes on the outside of a basement, inserting a reinforcement cage to the inside and placing concrete, completing a CIP pile(3) by boring the ground, inserting a reinforcement cage to the inside and placing concrete, and constructing the CIP pile, the deformed CIP pile and the tumbler tube soldier pile repeatedly in the unit of one group of three piles, thereby functioning a structural member resisting underground earth pressure and water pressure. |