发明名称 OPTIMISATION MANAGEMENT METHOD AND SYSTEM FOR LEAN PRODUCTION IN PANEL PRODUCTION LINES IN THE FURNITURE INDUSTRY
摘要 Method for the optimisation management of the production lines of panels in the furniture industry, particularly with production organisation into batch orders, comprising at least one module (20) for sorting the panels (1) in form of tables in the logistics of the production line preferably pursuing the strategy a batch orders, implementing operations for the reception, arrangement, orientation, aggregation and positioning of panels (1) from horizontal positions to vertical positions, as well as translation with respect to the ground of assemblies and groups of panels (1) laid on the side, oriented vertically, sorted by lines and columns on vector-matrix means (22) with parallel linear cells (24), suitable to allow the deposition and extraction of the panels (1) from the top and side in the direction of the linearity of the cells (24), where the contingent order of arrangement or the mapping of the panels (1), the methods of loading and unloading the panels (1) and the translation of the vector-matrix (22) with respect to the ground are defined by a computerised logic optimising the combination of a random-stochastic or tendentially random-stochastic loading of the panels (1) upstream and a tendentially organised unloading for groups as a function of the purpose of the batch and/or the contingent needs of the production line or portion of production line downstream. Device and operating line for the implementation of the method comprising at least one sorting complex (20) within the development of the production line constituted by at least one handling-sorting unit (20) including at least one container with cells or vector-matrix (22) translatable with respect to the ground, suitable to hold a plurality of panels (1) laid on the side oriented vertically in parallel channels (24) and sorted by lines and columns, contingently insertable and extractable both from the top and side, where the contingent order of arrangement or mapping of the panels (1), the methods of loading and unloading the panels (1) and the translation of the container with cells or vector-matrix (22) with respect to the ground are defined by a computerised logic optimising the combination of a stochastic or tendentially stochastic loading of the panels (1) upstream and a tendentially organised unloading for groups of panels (1) as a function of the purpose of the batch and/or the contingent needs of the production line or portion of production line downstream.
申请公布号 EP3100835(A1) 申请公布日期 2016.12.07
申请号 EP20160172436 申请日期 2016.06.01
申请人 G.P. Consulting di Giuseppe Pritelli & C. S.a.s. 发明人 PRITELLI, Giuseppe
分类号 B27M3/18;B23D59/00;B27B1/00;B27B31/00;B27M1/08;B27M3/00;G05B19/418 主分类号 B27M3/18
代理机构 代理人
主权项
地址