摘要 |
In a method for sequentially mounting panel elements (B). Fig 2, from bottom upwards wherein an upper (5) and a lower (6) lateral lever are mounted on an exterior wall (A) of a building seas to correspond to each of the panel elements (B); an upper (1) and a lower (6) hook are mounted on a back surface of each of the panel elements (B) for engagement with respective lateral levers, the improvement comprises: lifting the panel elements (B) by a lifting-guide unit (40), Fig 5; and employing joint spaces (29) between mounted panel elements as means for guiding the unit (40) in lifting operation of the panel elements (B). The unit 40 comprises ride members 40B each with rollers 53 for running up the front surface of the building and pilot/guide rollers 54 received in the joint spaces 29. <IMAGE> |