发明名称 Method and System for Selecting Power Sources in Hybrid Electric Vehicles
摘要 A method selects one or more power sources in a hybrid electric vehicle (HEV) at a particular moment in time for a current route to optimize energy consumption for the HEV, wherein the HEV includes one or more electric engines (EC) and one or more internal combustion engines, by first determining, in an off-line processor, a regression model that predicts a terminal cost of a state along a route from features associated with the route and the vehicle, using a computed true costs-to-go of multiple states from multitude of real or imaginary routes. In an online processor in the HEV, truncated dynamic programming is performed using the regression model to estimate a terminal cost at an end of a truncated time horizon for a current route. Then, one or more of the power sources are selected for the one or more EC and the one or more ICE based on a minimal cost-to-go of a current state.
申请公布号 US2016362096(A1) 申请公布日期 2016.12.15
申请号 US201514734428 申请日期 2015.06.09
申请人 Mitsubishi Electric Research Laboratories, Inc. 发明人 Nikovski Daniel Nikolaev;Farahmand Amir massoud
分类号 B60W20/11;B60W10/08;G01C21/34;B60W10/06 主分类号 B60W20/11
代理机构 代理人
主权项 1. A method for selecting one or more power sources in a hybrid electric vehicle (HEV) at a particular moment in time for a current route to optimize energy consumption for the HEV, wherein the HEV includes one or more electric engines (EC) and one or more internal combustion engines, comprising off-line and on-line steps: determining, in an off-line processor, a regression model that predicts a terminal cost of a state along a route from features associated with the route and the vehicle, using a computed true costs-to-go of multiple states from multitude of real or imaginary routes; performing, in an online processor in the HEV, truncated dynamic programming, using the regression model to estimate a terminal cost at an end of a truncated time horizon for a current route; and selecting one or more of the power sources for the one or more EC and the one or more ICE based on a minimal cost-to-go of a current state.
地址 Cambridge MA US