摘要 |
PROBLEM TO BE SOLVED: To achieve a safe operation of a train at low cost.SOLUTION: Each of ground elements 201 and 401 installed along the track 2 of a traveling train 1 has: an information holding mechanism for holding a unique code which is information unique to each ground element and a unique code of a ground element passed through next by the train traveling on a correct route; information transmission functions 204 and 404 for transmitting a unique code to the passing train; and an arithmetic processing part 103 for executing determination processing for determining matching between a unique code received from the ground element during next passage through the ground element after the holding of the unique code of the ground element passed next, which has been received from the ground element passed during traveling of the train, and the unique code of the ground element passed next, which has been received by the preceding ground element passage and included in the information holding function, and output processing for determining that the train is not traveling on a correct route to instruct brake control when the determination result shows unmatching.SELECTED DRAWING: Figure 1 |