发明名称 WORK EXECUTION METHOD FOR SCREWED PILE AND SCREWED PILE USED THEREFOR
摘要 PROBLEM TO BE SOLVED: To provide a work execution method for a screw pile and the screwed pile used therefor by which the efficiency of screwing-in penetration can be improved and the pile can be embedded by being screwed in up to a harder ground with a rotary torque greatly decreased, while a large end bearing capacity can be obtained by using a blade. SOLUTION: The work execution method is to install a hollow pile body 1 having a blade 10 at its tip or near the tip in the ground, in which an auger 20 is inserted in a pile body 1 so that its tip end is projected from the fore-end portion of the pile body 1 and then by giving a rotating force to the pile body 1 and the auger 20 in the mutually opposite directions the pile body 1 is screwed into the ground. When the pile body 1 reaches a specified depth, the auger 20 is pulled up. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005048590(A) 申请公布日期 2005.02.24
申请号 JP20040332670 申请日期 2004.11.17
申请人 JFE STEEL KK 发明人 HAYASHI MASAHIRO;OKAMOTO TAKASHI;SHINOHARA TOSHIO;MORI GEN
分类号 E02D5/56;E02D5/72;E02D7/00;E02D7/22;(IPC1-7):E02D7/00 主分类号 E02D5/56
代理机构 代理人
主权项
地址