摘要 |
Installation for investigation of effect of impact load at beam bend includes basis with controlled screws-stems, sample-beam with rectangular cross section, this rests on hinged-fixed and hinged-movable supports fixed on basis, beam that is fixed on the basis in middle between the supports and normally to basis, load that is held in initial state by electric magnet fixed on the holder. At distance from beam and at level of special catcher on the holder high speed video-camera Redlake Motion Pro Y5 is installed, this through quick-operating interface USB 2,0 is connected to computer. |