发明名称 Method for initializing expended modules in programmable logic controller system
摘要 A method for initializing expended modules in PLC (Programmable Logic Controller) system is provided in which an initialization request signal is generated and transmitted to a plurality of expended modules, when one basic unit initializes a plurality of expended modules, and an initialization completion signal is sequentially transmitted by the plurality of expended modules, when the initialization is completed, whereby the initialization time can be optimized, the method including performing an initialization operation after generating, by a basic unit, an initialization request signal and transmitting the initialization request signal to a plurality of expended modules, and determining that the initialization operation is completed, when an initialization completion signal is received from the expended modules connected to the basic unit.
申请公布号 US9405554(B2) 申请公布日期 2016.08.02
申请号 US201414171582 申请日期 2014.02.03
申请人 LSIS CO., LTD. 发明人 Ryu Hwa Soo
分类号 G06F9/44 主分类号 G06F9/44
代理机构 Lee, Hong, Degerman, Kang & Waimey 代理人 Lee, Hong, Degerman, Kang & Waimey ;Kang Jonathan;Salfelder Richard
主权项 1. A method for initializing expended modules in a PLC (Programmable Logic Controller) system, the method comprising: performing an initialization operation after generating, by a basic unit, an initialization request signal and transmitting the initialization request signal to a plurality of expended modules sequentially connected to the basic unit; and determining, by the basic unit, that the initialization operation is complete when an initialization completion signal is received, wherein performing the initialization operation includes a first of the plurality of expended modules receiving the initialization request signal from the basic unit and transmitting the initialization request signal to a next subsequent one of the plurality of expended modules and each of the next subsequent plurality of expended modules transmitting the request signal to a next subsequent one of the plurality of expended modules until the initialization request signal is received by a last of the plurality of expended modules, and wherein determining that the initialization operation is complete includes the last of the plurality of expended modules generating an initialization completion signal upon completing its initialization and transmitting the generated initialization completion signal to a next previous one of the plurality of expended modules and each of the next previous plurality of expended modules generating and transmitting an initialization completion signal to a next previous one of the plurality of expended modules upon completing its initialization until the first of the plurality of expended modules receives an initialization completion signal from a second of the plurality of expended module and generates and transmits an initialization completion signal to the basic unit upon completing its initialization.
地址 Anyang-Si KR