发明名称 Method for operating a power plant and gas turbine unit for implementing the method
摘要 A method is provided for operating a power plant, having a waste heat-generating gas turbine unit and also rooms which are to be air conditioned. Waste heat, which is discharged directly to the outside of the gas turbine unit, is used for heating the rooms which are to be air conditioned. A gas turbine for carrying out the method is also provided.
申请公布号 US9488072(B2) 申请公布日期 2016.11.08
申请号 US201213350779 申请日期 2012.01.15
申请人 GENERAL ELECTRIC TECHNOLOGY GMBH 发明人 Creamer Stephen Lawrence Thomas;Van Straaten Floris;Pfistner Jörg
分类号 F02C6/18;F01D25/28;F24D5/02 主分类号 F02C6/18
代理机构 Buchanan Ingersoll & Rooney PC 代理人 Buchanan Ingersoll & Rooney PC
主权项 1. A method for operating a power plant, comprising a waste heat-generating gas turbine unit and rooms to be air conditioned, the method comprising: using waste heat, which is discharged directly to an exterior of the waste heat-generating gas turbine unit, to heat the rooms which are to be air conditioned; wherein the waste heat-generating gas turbine unit is covered by a plurality of enclosures, the plurality of enclosures including a diffuser enclosure, a generator enclosure, and a gas turbine enclosure, in which the waste heat, which is discharged directly to the exterior of the waste heat-generating gas turbine unit accumulates thereby heating air in the plurality of enclosures, and wherein the waste heat which is used for heating is provided by a heat exchange of heat from the air heated in the diffuser enclosure and/or in the generator enclosure; and wherein the waste heat-generating gas turbine unit comprises a gas turbine, a diffuser arranged at a hot gas exit of the gas turbine, and a generator driven by the gas turbine.
地址 Baden CH