发明名称 CABLE PROTECTION TUBE AND CABLE LAYING CONDUIT LINE
摘要 <p>PROBLEM TO BE SOLVED: To realize a long span for handhole laying interval, by providing a plurality of projected strips extending on the outer peripheral surface of pipe in the pipe shaft direction, thereby reducing resistance when inserting a cable protection pipe to the inside of a conducting passage. SOLUTION: Many projected strips A, C extending in the pipe axis direction are provided on the outer peripheral surface of a cable protection pipe 1. Therefore, when pulling the cable protection pipe 1 to the inside of a conducting passage, the top of projected strips A, C may contact with the inner wall of the conducting passage, for example, and the inner wall of the conductive passage may contact with the outer peripheral surface of the cable protection pipe 1 at the top portion of the projected strips A, C. By a decrease in the contact area, the frictional resistance decreases greatly, and forces for pushing or pulling the cable protection pipe 1 can be reduced. As a result, if the pushing force or pulling force is almost identical, the unit length of a cable protection pipe 1 can be increased. Further, the span of the handhole laying interval can be increased.</p>
申请公布号 JPH10327525(A) 申请公布日期 1998.12.08
申请号 JP19970135350 申请日期 1997.05.26
申请人 KUBOTA CORP 发明人 SANJO KAZUAKI;IRIOKA HIROAKI;OSHIMO SHINZABURO;HIROBE TAKUYA
分类号 H02G3/04;H02G9/06;(IPC1-7):H02G9/06 主分类号 H02G3/04
代理机构 代理人
主权项
地址