摘要 |
The invention relates to a method for carrying out a test process relating to a rail vehicle (10). In order to provide such a method, wherein a fast-working, flexible, and in the event of a misdetection, a precise monitoring environment can be achieved, in particular without complex system or architectural adjustments to the rail vehicle, a stationary control unit (42) and a simulation unit (56) according to the invention are provided on the land side; a data connection (53) is established between the stationary control unit (42) and the rail vehicle (10); a data connection (57) is established between the stationary control unit (42) and the simulation unit (56), and the test process comprises a data traffic between the stationary control unit (42) and the rail vehicle (10) and the simulation unit (56). |