摘要 |
A method is provided for drilling a well in a reservoir. The method includes planning a well trajectory for a serpentine well pair. The production well is drilled using lateral displacements and vertical displacements to follow a base of a pay interval in the reservoir. The production well is completed with perforations in regions comprising a hydrocarbon. At least a portion of the production well includes a liner with no perforations.
|