发明名称 METHOD FOR INSTALLING OVERHEAD TRANSMISSION LINE SUPPORTS ON PERMAFROST SOILS
摘要 A method for installing pile foundations for power transmission towers or the like in different types of soil prone to frost heaving provides piles with bearing capacity against horizontal loads, reduced labor content and installation cost, and increased reliability against the impact of frost heaving forces of the soil on the pile. A casing pipe is driven in and then the pile is inserted into it, while installing rigid elements on the pile shaft by welding. When driving the pile, when a mark indicating a point of installation for a rigid element reaches the top of the casing pipe, a geometric measurement of gaps is made between the casing pipe and the pile. Based on the measurement, rigid elements are sized and welded in pairs on the opposite side in a vertical plane. The operation of placing and welding is then repeated during the pipe inserting.
申请公布号 US2016340858(A1) 申请公布日期 2016.11.24
申请号 US201615226876 申请日期 2016.08.02
申请人 Public Joint Stock Company "Transneft" ;Joint-stock company "Transneft Siberia" ;L.L.C. "Transneft Research and Development Institute for Oil and Oil Products Transportation" 发明人 Revel-Muroz Pavel Aleksandrovich;Smirnov Nikolai Vladimirovich;Kumallagov Vitaly Aleksandrovich;Semin Evgenii Evgenievich;Ivakin Alexandr Vladimirovich;Bogatenkov Yury Vasilevich;Zotov Mikhail Yurevich
分类号 E02D31/14;E02D5/60;E04H12/00;E02D27/35;E02D27/42;E02D7/02;E02D27/12 主分类号 E02D31/14
代理机构 代理人
主权项 1. A method of installation of power transmission towers on permafrost soils, comprising: driving a casing pipe into soil; inserting a pile into the casing pipe; while inserting the pile, installing rigid elements on a shaft of the pile by welding, for which the pile is marked to show a location for installation of the rigid elements; measuring gaps in between the casing pipe and the pile; welding the rigid elements in pairs on opposite sides of the shaft in a vertical plane, based on the measuring; and repeating the installing of the rigid elements during the pile insertion.
地址 Moskva RU