摘要 |
PROBLEM TO BE SOLVED: To provide a road face information-systematization method for pavement through which a series of information can be obtained to effectively make use of information of a road face and information after respective executed works such as cutting or paving processes (road face condition after cutting out and road face condition after paving work). SOLUTION: This road face information-systematization method for pavement is constituted of a first process A in which the conditions of a road face to be paved are measured and the data 1 are stored, a second process B in which the road face is cut on the basis of the data corrected from the condition data 1 of the road face and formation data as a reference level or projected formation data for a level desired in advance and then, the conditions are measured and the data are stored, a third process C in which after the road is paved on the basis of the condition data 1 of the road face and the condition data 2 of the road face after cutting work, the road condition are measured and the data 3 are stored, a fourth process D in which the cut profile of the paved road face is measured and the data and the data related to the condition data 1 of the road face, the condition data 2 of the road face after cutting work, and the condition data of the road face after paving work are stored as management data 4.
|