发明名称 LORRY SHIPPING METHOD OF LNG
摘要 PROBLEM TO BE SOLVED: To automate a manual work such as purge following lorry shipping of LNG, reduce load of a worker, and improve facility availability. SOLUTION: In a substitution operation with substitution gas performed in the lorry shipping of LNG, remotely operable regulating valves 10a, etc., and shut-off valves 11a, etc., are provided in an LNG loading line 8a and a boil off-gas line 8b of respective lorry shipping devices 7a, etc., and the lines are connected to pipes having remotely operable substitution-gas supply valves 12a, 13a, etc.,.and drain valves 14a, etc., and 15a for supplying and removing the substitution gas. Additionally, the substitution gas is supplied to a system partitioned with the regulating valves and shut-off valves of respective lines or a bottom valve of a lorry car, and then the substitution operation in which the drain valves regulating valves, or shut-off valves are opened to release gas or LNG in a loading arm, hoses 9a, etc., and pipes is automatically performed by an opening/closing operation of each of the valves based on a preset program.
申请公布号 JP2001324093(A) 申请公布日期 2001.11.22
申请号 JP20000146034 申请日期 2000.05.18
申请人 NIHONKAI LNG CO LTD;NIPPON STEEL CORP 发明人 HASEGAWA TATSUYA;ANZAI HAJIME;SAKAI HIROYUKI;YOSHIOKA HIDEYOSHI;TAGASHIRA SEISAKU;SATO SHUICHI;KAMITAKI YOICHI
分类号 F17C6/00;B67D7/04;B67D7/32;F17C13/00;F17D1/04;(IPC1-7):F17C6/00;B67D5/04;B67D5/32 主分类号 F17C6/00
代理机构 代理人
主权项
地址