摘要 |
The invention relates to a method for handling a hydro sound damper (1) in the area of an offshore construction site, especially in the case of a pile to be introduced into the seabed (11), wherein, prior to the noise-emitting works, a hydro sound damper (1) is positioned in the region of the offshore construction site. The invention further relates to a device (2) for reducing underwater noise and for handling at least one hydro sound damper (1) in the region of an offshore construction site, especially in the case of a pile to be introduced into the seabed (11), the device (2) comprising at least one hydro sound damper (1) having a carrier structure (16) and noise-mitigating elements (31) fastened thereto. |