发明名称 CONSTRUCTION METHOD FOR UNDERGROUND WIDENED PART
摘要 PROBLEM TO BE SOLVED: To provide a construction method for an underground widened part that may be implemented safely without excavation.SOLUTION: A construction method for an underground widened part includes the following steps for: removing a segment of a shield tunnel and constructing a starting base for a shield machine used for forming an underground widened part around the shield tunnel; starting a preceding shield machine from the starting base and installing a plurality of preceding shields in a ring form leaving an interval, the preceding shield having a segment for cutting disposed thereon; starting a following shield machine from the starting base and installing a plurality of following shields in a ring form while cutting a part of the preceding shield; forming a water cutoff area on outer periphery of the preceding shield and the following shield; connecting the preceding shield with the adjacent following shield and configuring a ring-form outer shell shield outside of the shield tunnel, thus forming an outer shell for the underground widened part; and excavating inside the outer shell shield after configuring the outer shell shield.SELECTED DRAWING: Figure 2
申请公布号 JP2016153601(A) 申请公布日期 2016.08.25
申请号 JP20160109914 申请日期 2016.06.01
申请人 MAEDA CORP 发明人 MORI YOSHIKI;YASUMITSU TATSUYA;SHINOHARA KEIJI;TANABE KAZUYA;MORITA ATSUSHI;TAKEBE TOKUJI
分类号 E21D9/04;E21D9/06;E21D11/00 主分类号 E21D9/04
代理机构 代理人
主权项
地址