摘要 |
PROBLEM TO BE SOLVED: To provide a device management system that includes a commissioning tool for reducing a time and cost required for the commissioning of a field device and improving the quality of the commissioning.SOLUTION: A device management system for performing validation prior to commissioning at least one field device comprises: a commissioning tool operable to receive at least one source file relating to the at least one field device for import operation; and a processor operable to check the source file for any error and, if at least one error is found in the source file, refer to an error resolution database so as to provide guidance for solving errors associated with the source file without terminating the import operation.SELECTED DRAWING: Figure 3 |