摘要 |
<p>The method involves fulfilling an abort criterion during the examining of the testing step. The processing steps (804,805,806,812,814,824,832,840), the evaluation step and the testing step are sequentially carried out in repetitive continuous cycles with fixed duration depending on the processed data. An independent claim is included for a detector arrangement for boom scanning based detection of received signals of multipoint to multipoint channels.</p> |